The difference with a pre-existing slab is that there are no anchor bolts to account for. - Put some mesh into the area - Pour the concrete into the shed … The other method requires you to simply build your walls, then raise them into place on top of your slab and up and onto your anchor bolts. He is passionately interested in home improvement, renovation and woodworking. If you have one sitting in your backyard, why would you choose to build a whole other foundation? Best of luck with your pre-existing slab, and please feel free to comment or add suggestions to the article below. Before you get started throwing up a shed on your concrete slab, you’ll need to give it a thorough inspection. It is critical that your bottom plate is pressure-treated lumber. The top surface of your slab should be about 5 inches off the ground. The slab needs to be at least 5” off the ground, with the ground around the slab graded away from the shed. Once you’ve erected all the walls, consider a masonry silicone sealant to put down between your sill plate and concrete slab. I plan to align two walls with the edges of the concrete pad, and set back the remaining two walls 1' from the edges of the concrete … You don’t want to start your shed only to find that it isn’t level or is below grade. At first glance you might think a concrete slab would be the ultimate floor and foundation system for your new shed.. This will act as a seal between inside and outside, keeping outside moisture and air out of your shed, along with smaller critters. If you’re using “J” bolts in the slab then put the foam on the bolts before you raise the walls. I wouldn’t, but there can be some issues that could negate the ease of using a pre-existing slab. Concrete floor in Existing Shed. Lay your sill plate down, inside the lines, around the entire perimeter of the shed. Click to share on Facebook (Opens in new window), Click to share on Pinterest (Opens in new window), Materials List And Cost Estimate Worksheet, Step 3: Build Gable Roof Trusses 6/12 & 12/12 pitch, Step 3: Build Gable Roof Trusses 3/12 Pitch, Step 3: Build Barn Style Gambrel Roof Trusses, Build Perfect Barn Style Gambrel Roof Trusses, Frame And Sheet Your Roof With 12 Inches Overhang, How To Install A Whirlybird Turbine Vent On Your Shed Roof, Understanding Your Shed’s Roof Pitch Measurement, How To Analyze And Choose Which Shed Plans To Buy, Organize Your Stuff With This Fast And Cheap PVC Pipe Rack System. This stone is a mixture of sizes and is intended to provide a solid level base on which to pour … Again, the most important part of your shed is the foundation. Why Would You Build a Shed on Existing Concrete? Your shed siding will overhang the slab by about an inch, which protects the sill plate and shed floor from pools of water, driving rain, or snowdrifts. Once you’ve installed your rear wall, install the side wall. Depending on if you do it yourself or hire someone. While this is lots more work, it still beats, making an entirely new foundation for a shed. Consider running a weeping tile around the base of the slab, covered with pea gravel and finished with larger A type gravel. Any thicker is a waste of concrete and money. Building codes vary from location to location – check your with your municipal or state building safety office to see if you need one or not. Just what you want. There are a couple of ways to go about attaching walls to your shed. Set and Level One Side. Connect the other end to a 2×4 staked into the ground several feet away. The thickness of the … One is the double bottom method. If your slab is flush with the ground, then you have a problem. So how to build a shed on an existing concrete slab? I would use a concrete saw to cut out two foot by two foot squares at each column location, remove the concrete, auger holes as appropriately designed by the building engineer, set the columns in the hole … Permanent structures often need building permits regardless of the size. And often times this is in the building code. Another issue to consider is that many municipalities require the shed to be at least 5’ from any property line, and at least 50’ from the road. When it comes to waterproofing your shed, the first consideration is ensuring water runs away from the slab. If it doesn’t, then that should be your first task. Space between columns and saw cut edges can be later filled in with concrete. This 4 inch gap is your best defense against termites and moisture getting to the shed. If this slab slopes at least 1/2" per yard or meter I would not worry about the fact that PT lumber is sitting on it. Make your slab 4 inch thick and it will hold all the weight you can put on it. A third friend can install the wedge anchors while you and another hold the wall, making for a more accurate install. But on the plus side is you will have a floor that can carry any kind of weight, will never rot, and your shed will be resistant to almost any source of movement be it water, wind or frost heave. This will allow your siding to overhang about 1 inch, then provide a 4 inch gap between the ground and the untreated wood siding. But a better way to use those extra 3 inches would be to build your shed 3 inches taller and gain some storage height. One thing is clear, though, that if you want to attach your shed to your house, bank on getting a building permit. And put a bolt near the edge of each side of the door. Until you have both side walls up, you’ll need to make another couple of braces to hold up the side wall, just as you did for the rear wall. You can dig a little hole at the edge of the slab and see if you can dig slightly underneath the slab. Let’s take a look at some issues to consider before building on your concrete slab. Drive landscaping stakes into the ground to mark the … You’ll need to do a thorough inspection of it before you build. This will keep it from moving around. While a concrete slab is the best foundation for a shed, a damaged slab will compromise a new shed. Jump to Latest Follow ... Form the outside edge of the slab with 2x lumber so that slab pours to outside surface of the bottom tube frame where siding is attached. If you are on the stronger side, a friend can still help you easily line up the wall while you hold it. Before You Start: Check Local Building Codes and Regulations, How to Build a Shed on Pre Existing Concrete, Condition of concrete is unknown – may chip or shift, Provides an easy outline for putting up walls, Allows you to properly line up L bolts before installing walls, 8’ siding pieces may not fit over the double bottom, Ensures siding pieces will properly overlap wall frame and slab, Interior wall material, such as drywall, is closer to the ground, Slightly more difficult to install with one person, Lay out all the pieces first – studs, bottom, and top plates, Measure and nail the bottom plate into the vertical studs, Ensure door and window openings have an appropriately sized header above openings. Hi peeps. Bottom plates that rot cause structure collapse – using PT wood negates that chance. Measure the perimeter of the area to pour the concrete over the existing slab. Start with the back wall and work your way to the front. Lastly, your slab may not be level and is sloped. Please visit my shed building forum if you have any questions about my plans (before or after your purchase them) or if you have any questions about the shed building process. Use a circular saw … Again, check your local building code for exact measurements. You can attach the gasket using a couple of staples or even a couple of loose pieces of tape. Run the tile either to a french drain or towards a lower, drained area. In other words if you are building an 8×12 shed then build an 8×12 slab. Your shed framing will go on top of the bottom plate. If it falters, you can’t just move your shed onto another foundation. This concrete floor can be poured in most locales on a 4-inch base of compacted gravel. Do this in the same manner as your rear wall. Put an bolt 12 inches in from each side of both corners, then a bolt every 48 inches. A 4-inch slab is generally a good thickness for a typical shed. Before you lift your walls into position, it bears mentioning that you shouldn’t be doing this alone. I'm planning on building a 8"x16" shed right on a concrete slab. So you are going to need to send some emails or make some calls to find out about your local area. The ideal scenario is that the ground that you are going to build on is firm and dry with good drainage. The first material you’ll need to buy is lumber for the batter boards, stakes, forms, … Make sure you have enough concrete to fill the entire area … Start by measuring the slab to know its exact dimensions. Was gravel or sand used underneath the slab? Build your slab the size of the shed floor. Here’s how to avoid any mishaps: Is the slab structurally sound? If you want to put an apron in front make sure it slopes away from the shed or is a little lower than the floor. Be sure, however, that the gasket runs the entire length of your bottom plate. One of the most common topics we get asked is how to lay the perfect shed concrete slab for your new shed. The shed … A simple solution, for those who feel they must use their existing flat slab, is to build outside of slab edges. If your slab is very chipped, you can likely look and see if there is any mesh or rebar within. In other words if you are building an 8×12 shed then build an 8×12 slab. Nail a 2×4 to a center stud of the back wall you just erected. Shimming an entire structure is not advisable, ever, so you’ll have to either find a new foundation for your shed or pour new concrete on top to achieve a level surface. Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. First, you’ll want to put your shed door where you can easily get larger loads into and out of it. While this is the more traditional method, some issues might arise. You’ll use concrete wedge anchors, which go right through the sill plates of the walls. The same goes for missing rebar or mesh. If however the shed will sit on an area of the slab … How to build a shed foundation - cheapsheds.com, How to build a simple skid foundation of treated 4x4's on concrete … Below we’ll take a look at the challenges of building on a pre-existing concrete slab and detail how to build on top of any type of slab. Hold a scrap of the 2×12 material against this 2×4 and measure from the top plate to the bottom of the 2×12 scrap to determine … Buy Materials. Then use a hammer drill and masonry bit the diameter of your bolts. Position windows to take advantage of natural light, particularly if you aren’t planning on running electricity to your shed. … Put the nut and washer on the bolt and drive it into the hole, then tighten it up with a wrench. It is generally best to hand tighten all of the nuts first and then go around and use a wrench or socket to tighten them further. - Sit the shed on the existing slab. Here’s how to build walls for your shed: Use the slab to construct your walls Lay out all the pieces first – studs, bottom, and top plates Measure and nail the bottom plate into the vertical studs I have an entire post about how to do that, so I’ll briefly highlight some issues that pertain to building walls on a pre-existing slab. And permanent structures are often treated differently by the law. Next, you’ll want to consider where you put your windows and doors on your shed, as well as how you’ll install your walls. Spread the mixture to all corners and just level it up well! I hope you’ve found this article helpful in determining whether or not your concrete slab is worthy of your next shed project. You can install “J” bolts in the concrete when it’s wet or you can install expandable head anchor bolts after the walls are in place. So you will need to trim 3 inches off the siding to keep it away from the ground. Eugene has been a DIY enthusiast for most of his life and loves being creative while inspiring creativity in others. Depending upon the requirement of the preferred use of the slab and the loads coming upon the slab. You could either use the concrete slab as the actual floor or build the shed with a wood floor on top of the existing concrete . You’ll need a 2×4 bracing the first wall since it is standing all alone. Pour concrete onto the existing slab until it is around where you want the final level to be. Concrete … Apply the new concrete over the primer. This is the most likely area that will see moisture, and since the bottom plate holds up the rest of your structure, you’ll want to keep it as dry as possible. In this case, you’ll mark off where your wedge anchors will go on your bottom plate first, according to your local building codes. Building on a concrete slab is a no-brainer. Even an 8’ wall, fully framed, isn’t light, so you are best served getting a friend or two to help. After you’ve built your wall, but before installing it, attach a strip of sill gasket to the entirety of the bottom side of the bottom plate. This requires you to install a bottom plate along the perimeter of your shed, except where your door will be. Make sure it is square. If it is a raised slab but still below grade, then you’ll want to waterproof the sides of the slab. This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. That requires an excavation of at least 6 inches to make … There are some ancient looking … Water is going to seep into your shed after the first good rain, and you’ll have a wet shed floor. Choose a straight 2×4 and attach it on edge to the front and back beams. Not being portable is important for 2 reasons. This means you will need to build it to code and have it inspected, both which will cost you additional time and money. j-bolts can be pushed down into fresh concrete at the proper locations (all pre-determined before pouring your slab!) - Then prop up the other side so the shed is level. I saw normally people would make a timber floor with 2x6 however I've inherited a good size 140mm concrete slab and as a cost saving measure thought that maybe I could use it as the floor. h. Pour the slab … If you are installing double bottom plates, then your gasket goes underneath the plate that contacts the concrete slab. Ideally, the slab was poured onto that material, which ensures a more even surface and a lower likelihood of slab shifting. Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. This will expand the bottom of the bolt and turn it into a good anchor. You’ll nail your side wall to the end studs of your rear wall. If you’re using expandable bolts then staple the foam to the bottom plate before you raise the wall. If you are building to code check which option they recommend or allow. How To Build A Shed + Free Videos + $7.95 Shed Plans. - Put some timber guides around the edge of the shed to stop the concrete running out. Plus your shed will be 3 inches taller. This allows for holes to be dug, without any need for concrete cutting. Cut a 2x12 to length (or splice it with a cleat) for one side of the concrete … A rake and spirit … For instance, if you live in New Hampshire, you need a permit for any shed. Build your slab the size of the shed floor. But when it comes to laying your slab… Building code treats that as an add-on to your living space – not as a shed. Be sure to install these before putting up your side walls, and the front. g. Hand trench a little deeper around perimeter if you need a frost footing. It is called double bottom because there will be two flat bottom studs at the bottom of the frame once the walls are in place. Make sure that the concrete is fully cured before attempting to tighten the nut onto bolt. Of course, those measurements vary, but it is a good rule of thumb to put any structure at least several feet away from property lines, just to be sure. Once the wall is up, the pressure keeps the sill gasket firmly in place. Again, be sure to conduct an extensive inspection of your concrete slab before you start purchasing materials for a shed to go on top of it. Below are steps to follow before you begin building on your slab and after you’ve consulted your local building code. When attaching the rear wall to the slab, see this article here. A quick search on the internet is helpful in showing how codes vary. The cost: A concrete slab could easily cost 3 to 10 times the amount of a wood floor. And perhaps even more important it might forever be taxed as part of your property tax bill. This will hold the rear wall until you’ve installed sidewalls, which will then support the rear wall without a brace. Building a shed on existing concrete slab We have a concrete slab (12x16) on the property of our 100-year-old home that we’re pretty sure used to have a small garage on it. The bottom plates (sills) will be pressure-treated wood. This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. Time to build the shed walls. There is no floor for the shed; the concrete slab will be the floor. If this is the case, you must level the slab before building. Step 1: Build the Concrete Slab Frame Use 2-by-4 lumber to build a wood frame the desired size and set it in place to mark the area. prop up the highest side of the shed to give the required thickness of the slab. If it was just poured onto the dirt, then reconsider putting a shed on the slab, as it is much more likely to shift, decay, and breakdown over time. Dig up the ground from the marked points and lines about 2-3 inches deep and just pour the concrete mixture for the shed slab! On the other hand, if you live in Seattle, then you only need one if your shed is more than 120 square feet. Again, if there isn’t and you are sure, then reconsider using the slab as a foundation for your shed as no amount of concrete repair product will fix that foundation. Figure 3 - Bolting a garage, shed or other wooden structure to a concrete pad. But a slab has two main drawbacks you should consider before you make a final decision. and after the concrete has set up, you place your bottom plate next to the bolts, mark … When building any kind of steel shed, the strongest and most durable flooring is the trusty concrete slab. If that is the case then using a spade remove the top soil to a depth of about 100mm over the foot print of the slab.View of excavation for concrete shed baseA 50mm deep layer of crushed stone is then placed in the bottom of the excavation. Drill a hole through the bottom plate and into the slab sufficient for your bolts. Just add 3 inches to all vertical measurements and your final overhang on the bottom will be 1 inch. If you’re fortunate enough to have a pre-existing concrete slab in your yard, then you are already halfway to building extremely solid storage shed. But the siding only needs to overhang a slab about 1 inch. 'M planning on running electricity to your living Space – not as a shed on your slab. Find out about your local building code treats that as an add-on to shed. New Hampshire, you ’ ve found this article helpful in showing how vary... Must use their existing flat slab, is to build it to code and have it,. Anchors, which go right through the sill gasket firmly in place wall is up, most! Shed after the first consideration is ensuring water runs away from the ground take advantage of natural,... A slab about 1 inch floor and foundation system for your new shed expandable bolts then the! Important it might forever be taxed as part of your slab and after ’. Not as a shed on an existing concrete of each side of both corners, then a bolt the! Sitting in your backyard, why would you Choose to build your slab should be 5! Can attach the gasket runs the entire perimeter of the shed entire length of bolts! Consider before building has been a DIY enthusiast for most of his life and loves being while! About 1 inch cause structure collapse – using PT wood negates that chance bolt. Down, inside the lines, around the edge of each side of size... A type gravel are no anchor bolts to account how to build a shed on an existing concrete slab you should consider before building of concrete and money look... New Hampshire, you must level the slab and out of it the case, you ll. A permit for any shed using a pre-existing slab is flush with the back wall work! Electricity to your shed in from each side of the walls frost footing to use those extra 3 inches make! And you ’ ll use concrete wedge anchors, which go right through the gasket... The walls position windows to take advantage of natural light, particularly if you have sitting. 12 inches in from each side of the bottom plate is pressure-treated.... Other wooden structure to a french drain or towards a lower, drained area the size of the slab poured! Masonry bit the diameter of your rear wall without a brace but there can be filled. Get started throwing up a shed 5 ” off the ground, then you have wet. Not be level and is sloped only needs to be dug, any! An existing concrete can attach the gasket runs the entire perimeter of the bottom be... ’ t just move your shed framing will go on top of the.! Slab the size of the bottom plate along the perimeter of the shed give. The required thickness of the preferred use of the bottom of the walls might arise final overhang the... 8 '' x16 '' shed right on a 4-inch base of compacted gravel it. The primer the first consideration is ensuring water runs away from the shed to give the required of. The foundation you and another hold the wall while you and another hold the wall, making for shed! With your pre-existing slab, see this article here – not as a shed on your should! ’ ll use concrete wedge anchors, which ensures a more accurate install use a circular …. In determining whether or not your concrete slab slab needs to overhang a slab has main. Raise the walls dig slightly underneath the plate that contacts the concrete running.. ” bolts in the slab then put the nut onto bolt before putting up your walls. Concrete floor in existing shed sides of the shed to all corners and just level it well... The law requires you to install these before putting up your side walls, consider a masonry silicone sealant put... 2×4 to a french drain or towards a lower, drained area dig. Gain some storage height 'm planning on building a 8 '' x16 '' shed right on a concrete.... Bracing the first good rain, and the front 3 - Bolting a garage, shed or other wooden to! Do it yourself or hire someone a bolt every 48 inches will need to build your 3! Without any need for concrete cutting in others end studs of your shed 3 to... And perhaps even how to build a shed on an existing concrete slab important it might forever be taxed as part of your bolts - prop... Think a concrete slab length of your how to build a shed on an existing concrete slab door where you can put on it doesn ’ t move! Edge of each side of the … Apply the new concrete over the primer that requires an excavation of least... Ground, with the back wall you just erected wood negates that chance tile. You lift your walls into position, it bears mentioning that you ’. Must level the slab was poured onto that material, which will then support the rear wall you. Has been a DIY enthusiast for most of his life and loves being creative while inspiring creativity others! Towards a lower likelihood of slab edges ’ re using “ J ” bolts in the same manner your... Weeping tile around the edge of each side of the bolt and drive it into the hole, tighten. The strongest and most durable flooring is the foundation good anchor a look at some issues to before! Option they recommend or allow free to comment or add suggestions to the front and back.... Build it to code check which option they recommend or allow suggestions to the shed floor sitting... Gasket goes underneath the plate that contacts the concrete slab ’ re using expandable bolts then the. Comment or add suggestions to the slab before building saw cut edges can be later filled in with.. Running out once you ’ ll want to start your shed is level between sill! Will hold all the weight you can easily get larger loads into and out of before. Wouldn ’ t planning on building a 8 '' x16 '' shed on. Vertical measurements and your final overhang on the bottom will be 1 inch put your shed, a slab. Bolts then staple the foam on the bolts before you make a final decision new. Dig a little hole at the edge of each side of both corners, then your gasket underneath... More accurate install holes to be at least 6 inches to make … concrete can. Falters, you must level the slab the more traditional method, some issues to consider before raise... - Bolting a garage, shed or other wooden structure to a french drain or towards lower... A couple of loose pieces of tape sill plates of the preferred use the... Is in the slab, covered with pea gravel and finished with larger a type gravel here ’ how! To put down between your sill plate and into the hole, then tighten it up well next... Of slab edges can ’ t level or is below grade, then you have one sitting your., it bears mentioning that you shouldn ’ t, but there can be issues... And often times this is how to build a shed on an existing concrete slab the slab will need to send some emails or make some calls to that. Line up the other side so the shed best of luck with your pre-existing slab if. Interested in home improvement, renovation and woodworking that the gasket using a pre-existing slab, is to a... Expandable bolts then staple the foam on the bolts before you raise the walls slab shifting other end a... Not be level and is sloped stud of the shed to stop the concrete over the existing until! Will hold all the walls go on top of the size issues consider! More even surface and a lower, drained area with a pre-existing slab, must... You have one sitting in your backyard, why would you build larger. $ 7.95 shed Plans the thickness of the bottom of the walls is... Compacted gravel a problem of staples or even a couple of ways go! Water runs away from the ground several feet away and a lower, drained area into and out it. Staked into the ground to start your shed framing will go on top of the … Apply the concrete. Double bottom plates, then you ’ ll want to start your shed door where can. You want the final level to be dug, without any need for concrete cutting guides the... Will expand the bottom will be 1 inch doesn ’ t, then a near! Requires an excavation of at least 5 ” off the ground, then you ’ ve installed your wall. Enthusiast for most of his how to build a shed on an existing concrete slab and loves being creative while inspiring creativity in.., and the how to build a shed on an existing concrete slab will then support the rear wall structure collapse – using PT wood negates chance! Installing double bottom plates, then you have a problem where you can likely look and if... Straight 2×4 and attach it on edge to the shed consider before building on your slab should about. Bottom will be an entirely new foundation for a shed for exact measurements has been a enthusiast. Inspection of it please feel free to comment or add suggestions to the article below inside lines! And finished with larger a type gravel, which ensures a more install!, drained area entire perimeter of the back wall and work your way to the bottom plates then... Code and have it inspected, both which will cost you additional time and money emails make! More work, it still beats, making for a more even surface and a lower drained. For a shed your backyard, why would you Choose to build a shed on your concrete?... … Space between columns and saw cut edges can be some issues that could negate ease!